Improve Ventilation
The ventilation of the building was poor, especially during the pandemic period, posing risk to air-borne communicable disease.
Minimal Disruption
The facility is occupied 24/7, hence the project had to be executed such that it doesn’t interfere with the operations and living conditions of the occupant/end user.
Building Facelift
Building required a facelift painting, mechanical and electrical service installations of all faulty ones.
General Painting, Demolition of existing window and burglary.
Supply and Installation of aluminium window and burglary.
Mechanical and Electrical service installation.
Making good of existing ceiling.
Supply and Installation of wooden and Turkey doors.